at Filton
+
INCOSE UK Service Systems Engineering Working Group
 +
 
 +
Meeting: 6 June 2016, Rolls Royce, Filton, Bristol
 +
 
 +
 
 +
== Attendees: ==
 +
 +
*Iain Cardow (RR), Alan Crawford (Babcock), Andrew Farncombe (INCOSE), John Davies (Leeds), Tim James (NHS), Edwin Swidenbank (Harmonic)
 +
* and Peter Mason by conference phone.
 +
 
 +
== Actions from last meeting ==
 +
*Steve Ashlin to contact James Hillman  No contact made. Decided to drop this action and talk to James at other meetings.
 +
*All to review IBM Service Science community website.  Seen as way of pushing IBM products rather than contributing to our work. 
 +
*All to look at case studies with regard to things we have come up with.  Two case studies looked at - for ASEC2016 paper.
 +
*All to review NAF 4.0 draft for Service Views.  Looked at - NAF is going very much Service based, but no work being done on it.
 +
 
 +
== Status of IS2016 paper ==
 +
*Paper submitted and accepted as paper 54.
 +
* All release forms completed.
 +
* John applied to attend by the deadline so the paper will go into the programme. 
 +
* Slides now moved onto IS2016 Powerpoint template.
 +
 
 +
== ASEC2016 ==
 +
=== Paper ===
 +
* Aim of paper is to apply ideas/approaches from the ASEC2015/IS2016 papers to two Case Studies
 +
* Abstract submitted and approved. 
 +
* Now need to provide 6 page paper by 10 June.
 +
 
 +
=== Discussions ===
 +
 
 +
'Rough' slides were used as focus for discussions. 
 +
=== Workshop ===
 +
Agreed to ask ofor a 45min workshop at the conference.  We hope this is after the paper presentation and we can discuss What is needed to go forward.
 +
 
 +
=== Poster ===
 +
All Working Groups asked to submit poster - can be done using the slides in the Presentation.
 +
 
 +
=== Way forward ===
 +
* John to draft paper and send out late on Tuesday 7 June (a lot of it is using existing words).
 +
* Phone in 14-00 on 8 June to go through comments, Iain to set up.
 +
* John to update and send into INCOSE on 10 June.
 +
 
 +
 
 +
 
 +
 
 +
== Next Meeting ==
 +
 
 +
*Monday 19 September 11-00 to 15-00 Rolls Royce, Filton.

Revision as of 11:02, 9 June 2016

INCOSE UK Service Systems Engineering Working Group

Meeting: 6 June 2016, Rolls Royce, Filton, Bristol


Contents

Attendees:

  • Iain Cardow (RR), Alan Crawford (Babcock), Andrew Farncombe (INCOSE), John Davies (Leeds), Tim James (NHS), Edwin Swidenbank (Harmonic)
  • and Peter Mason by conference phone.

Actions from last meeting

  • Steve Ashlin to contact James Hillman No contact made. Decided to drop this action and talk to James at other meetings.
  • All to review IBM Service Science community website. Seen as way of pushing IBM products rather than contributing to our work.
  • All to look at case studies with regard to things we have come up with. Two case studies looked at - for ASEC2016 paper.
  • All to review NAF 4.0 draft for Service Views. Looked at - NAF is going very much Service based, but no work being done on it.

Status of IS2016 paper

  • Paper submitted and accepted as paper 54.
  • All release forms completed.
  • John applied to attend by the deadline so the paper will go into the programme.
  • Slides now moved onto IS2016 Powerpoint template.

ASEC2016

Paper

  • Aim of paper is to apply ideas/approaches from the ASEC2015/IS2016 papers to two Case Studies
  • Abstract submitted and approved.
  • Now need to provide 6 page paper by 10 June.

Discussions

'Rough' slides were used as focus for discussions.

Workshop

Agreed to ask ofor a 45min workshop at the conference. We hope this is after the paper presentation and we can discuss What is needed to go forward.

Poster

All Working Groups asked to submit poster - can be done using the slides in the Presentation.

Way forward

  • John to draft paper and send out late on Tuesday 7 June (a lot of it is using existing words).
  • Phone in 14-00 on 8 June to go through comments, Iain to set up.
  • John to update and send into INCOSE on 10 June.



Next Meeting

  • Monday 19 September 11-00 to 15-00 Rolls Royce, Filton.