SSE Meeting 16
From Service Systems Engineering Group Wiki
Contents |
INCOSE UK Service Systems Engineering Working Group
Meeting: 28 September 2015, QinetiQ, Farnborough
Attendees:
Steve Ashlin, Iain Cardow, Andrew Farncombe, John Davies
Progress on actions:
- General: change term ‘Use Case’ to ‘Case Study’ to avoid confusion with the more formal use of Use Case in some methodologies – ongoing
- General: include review of TOGAF in future work - ongoing
- SA: to send out version F of the plan - done
- SA: to try to make contact with Thales/AFIS about their work on Services. – ongoing
- AF: to review Systems Engineering Handbook v4 for ‘Services’ content. This has been reviewed, now closer to SEBok. AF to write up.
- IC: to find out update policy for SEBok – on going.
ASEC2015
Paper
- Add diagram on types of Service (Tukker)
- Add Annex/Appendix List of Harmonised Definitions
Presentation
Defined set of slides
- Purpose of WG – 2 slides
- Context
- Content
- What is a service?
- Random (2)
- Engineering (1)
- Service Definitions Map
- Harmonised definitions
- What types of services are there?
- Continuous
- PSS (Tukker)
- Case Studies
- What are the Characteristics of each type of service?
- CSA 76 – 4 drivers that make services difficult
- SSE characteriation headings
- How can we engineer each type of service?
- SSE
- SOA
- AFIS Lifecycles
- Examples
- Train
- Open Group Car Wash
- Leeds/Nectise Area Surveillance
- SE comparisons
- SeBok
- INCOSE Hbook
- MBSE
- Summary
- Whats next and how can you help?
- Presenter – tbd.
Poster
- to follow presentation
Next Meeting
- 13 October, phone-in. to review presentation
- 17/18 November at ASEC 17/18 November